Petronas Angsi Complex

ExxonMobil Exploration & Production Malaysia Inc. and Petronas Carigali’s partner began development of the Angsi complex on development Mar. 5, 2001. An integrated oil and gas central processing platform is connected to a 52-well drilling platform via a 100-m bridge, as well as a 32-well satellite drilling platform. There are connections to existing gas production facilities at Guntong-D and Seligi-A, a connection to the existing oil production facilities at Tapis, and a new 166-km pipeline from the Angsi complex to the onshore receiving facility. Angsi’s initial flow was 15,000 b/d of oil and 60 MMscfd of gas. At peak, Angsi should produce 65,000 b/d of oil and 450 MMscfd of gas (10% of Malaysia’s current oil production and 17% of its current gas production, respectively). KEVTA Fire Systems supplied fire protection systems for turbomachinery deployed in the Angsi complex.